>> Sauermann Group Network

A few Basic Rules PE 5100

PDF

Friend

A few Basic Rules

Before carrying out any operation on the pump: make sure the installation is disconnected from the power supply.

Before installation, thoroughly rinse the coil and the condensates collection tank to remove any foreign bodies and metal particles.

Installation

Condensates are removed from the air conditioning unit at the tank outlet via a 6 x 9 mm tube and the PE 5003 connector supplied with the pump.



Carry out an in situ test and prime the pump. To do this, gently fill with water using the priming squeezie bottle ACC00401. Press the test button on the PE5100 to operate the pump for three minutes.



Operation

The pump switches on when the temperature difference across the coil as measured by the two sensors is more than 6°C. The pump stops 3 minutes after the temperature difference falls below 6° C.

Maintenance

Replace the tube PE 5002 at least every year and the pump head PE 5001 every two years or as required. (Remove the 4 screws, disconnect the connector and fit the new head).


Return

Search engine

Tools

HELP FOR INSTALLATION
PRODUCT SELECTOR