Before carrying out any operation on the pump: make sure the installation is disconnected from the power supply.
Before installation, thoroughly rinse the coil and the condensates collection tank to remove any foreign bodies and metal particles.
Installation
Condensates are removed from the air conditioning unit at the tank outlet via a6 x 9 mm tube and the PE 5003 connector supplied with the pump.
Carry out an in situ test and prime the pump. To do this, gently fill with water using the priming squeezie bottle ACC00401. Press the test button on the PE5000 to operate the pump for three minutes.
Operation
Pump operation is dependent on the operation of the air conditioning compressor or whenever the system provides cooling. The pump will continue to run for three minutes after the compressor has stopped.
Maintenance
Replace the tube PE 5002 at least every year and the pump head PE 5001 every two years or as required. (Remove the 4 screws, disconnect the connector and fit the new head).